Streamlining Design-to-fabrication With VDC and Constructible BIM

The introduction of the integrated project delivery (IPD) project cycle is putting more of the onus on general contractors, mechanical contractors and specialty contractors to have a larger stake in the game when it comes to design/ While general contractors have long been some of the most advanced users of BIM technology for its ability to facilitate collaboration among design teams, architects, engineers and contractors, traditionally the mechanical electrical plumbing (MEPs) and specialty contractors have limited their BIM adoption… [Read more]